aptimus/labs
Situations

Month-end eats a week.

At month-end someone exports from every tool, lines the numbers up in a spreadsheet and chases what doesn’t match. The report arrives late, and nobody fully trusts it.

The problem

The report is copied together, not built.

Every month the same exports, the same formulas and the same corrections. A week of skilled time goes into numbers a system could pull on its own.

  1. 01 · Pulls

    The numbers from every tool

    Your ERP, accounting, CRM and spreadsheets, on a schedule.

  2. 02 · Builds

    The report in your layout

    The same tables and checks your team builds today, sent to the people who read them.

  3. 03 · Flags

    What doesn’t add up

    A number that doesn’t match goes to a person with the rows behind it, before the report goes out.

What we would build

The weekly report, in 2 weeks.

Map first: one week to measure what it costs today and write the plan. Then a fixed-price build that runs every week, so month-end becomes a check, not a project.

Proof

A measured case for this situation comes once the numbers are in.

We publish numbers only once they are measured and signed off. Until then, the proof is Handpick, our own product, built and run in production by the same engineers.

Next step

Tell us what month-end takes.

One sentence is enough. We reply within one business day.

What happens next: a short email, then a 20-minute call. No slides.